Excavation Work

Employees who do not comply with the requirements of these Regulations shall be prosecuted under current legislation. Chapter 2 SAFETY BEFORE Before beginning excavation worker must: a job at the head works, about the project of works (hereinafter – the CPD) or technology card; check the serviceability of personal protective equipment and wear them, check the serviceability of tools, devices and equipment needed for the job; see the workplace and the approaches to it (the presence of barriers, ladders, safety bindings, soil conditions, slope stability, the presence of concentrations of groundwater and surface water, the adequacy of lighting at night), clean the work area from debris and unnecessary items free passages, and in winter – to clear of snow and ice, sand or slag.When a fault is detected in the fence, insecure ground, landslides, cracks in the ground, there is exposed on the slopes boulders, boulders, stones that are in an unstable state, and other hazards must notify supervisor and under his leadership to take steps to eliminate them. Before carrying out excavation work in high-risk, which is made for the dress-tolerance (in areas with pathogenic contamination of soil in the area of placement of underground utilities, while performing work in wells, pits, near the roads and railways, and other dangerous places), as well as occasional work not connected with direct responsibilities, to pass the target instruction. When using electric tools or air tools need to: ensure the integrity of the body parts, electrical cable (air hoses), the reliability and accuracy of mounting of parts to test the tool idle.

Navigation